Project characteristics

Project designation:

Carried out for the logistics center of the Klalit Health Insurance Fund in Be'er Sheva for the use of the employees in times of emergency.

Net size 6 square meter shield + entrance to protect the door.

Construction method:

Type: mobile structure (the building is transported for placement).​

Planning: The design was carried out by the company A - S.I.P.H. Ltd. in accordance with the defense standards for the institutional protective territory and approved by the signatures of the engineers of the Ministry of Defense.​

Placement: The building was placed on a pre-prepared territory according to the model that was given to the customer.​

Structure Preparation: the construction was carried out at the production plant in accordance with the standards, and the planning was carried out under the supervision of engineers in accordance with the construction standards and the customer's requirements.​

Accessories:

Door protection: entrance vestibule for maximum protection from above and fragments of heavy rockets from the southern direction.​

Auxiliary accessories: Photoelectric (solar) system of electricity and lighting according to customer requirements, including emergency lighting and ventilation​

Protective frames: Accessories in the protective structure are a side window, ventilation pipes and side doors. All frames meet the standards of the Ministry of Defense

Delivery package to the customer: includes plans for standard signs for frames and electrical approval, laboratory tests

Mobile sheltered buildings project for Klalit Be'er Sheva Health Insurance Fund

Delivery to the customer:

Execution time: 35 days.

Delivery date to the customer: early 2020