PRO-TEC

Residential protected space - private house

Project characteristics

Project designation:

Сonstruction of a residential protective structure in a local development for a residential building in Ramla

The area of ​​the building is 9 square meters.

Construction method:

Type: stationary construction according to the customer's project.​

Preparation of the building: The construction was carried out in a residential area to ensure an optimal connection between the existing building and the new construction.​

Laboratory certification: all stages of construction are accompanied by a certified laboratory for the study of concrete protective frames.​

The area of ​​the connection of the MAD to the building: designed in such a way as not to harm the level of protection for users.​

Planning: Planning completed by the client, reviewed and approved by the protection planning company A – S.I.P.H. in accordance with the norms of the Ministry of Defense for a residential protective zone

Foundation of the structure: The structure was built in the field on the basis of a raft and rammed soil

The connection of the building to the residential building: The building is constructed with a foyer in a location that allows easy entry and exit of the apartment, taking into account the needs of the apartment and minimal damage to the existing building.​

Accessories:

Door protection: entrance for maximum protection from above and debris according to the reference scenario of the Ministry of Defense.​

Protective frames: accessories in the protective space of the apartment - the entrance door of the apartment, the front window of the apartment, ventilation pipes, all frames meet the standards of the Ministry of Defense.​

Building accessibility: The building is accessible for people with disabilities.​

Auxiliary accessories: electrical system and lighting system in accordance with the requirements of the Ministry of Defense, including emergency lighting and ventilation.​

Building ventilation and filtration system: in the protected structure, a wet area (shower basin) was prepared, including floor partitions and protection of pipelines to ensure the tightness of the building.​

Delivery package to the customer: includes plans for standard signs for frames and electrical approval, laboratory tests

Delivery to the customer:

Execution time: 40 days.

Термін здачі замовнику: липень 2019 року

Contact us

Fill out the form and a PRO-TEC representative will contact you shortly